12 ton Chiller unit.

Hanlon and Wright engineers recently re-sited this 12 ton chiller unit from a Chemical plant in Yorkshire to premises in Greater Manchester.

Using a 100 ton crane along with 4 off lifting beams and lifting bars, the Chiller unit was uplifted and loaded onto Hanlon and Wright TRansport, we then delivered the chiller unit to premises in Greater Manchester, where we off loaded it using the same crane then skated the chiller unit into the building.

Once in position our engineers assisted in removing old coils, compressors, etc, then fitted new.