This installation was at a crematorium in Yorkshire, the job entailed removing the old equipment, flu's, filters, chimney stacks, etc, then installing the new equipment which was all much greater in size, here we have a 7 tonne boiler which we stood upright at the doorway using one of our 7 tonne fork lift trucks, skated accross the floor to it's final position, jacked up, removed the skates, lowered back to ground level, lined, levelled and fastened down, the installation of the chimney stack was carried out using 2 x mobile cranes, along with a man basket to feed the chimney down into position and secured.

14.09.12