Off loading and positioning of 6 ton packing machine in North Wales.

Here we have Hanlon and Wright engineers of loading a 6 ton packing machine at premises in North Wales. The machine was offloaded using a 50 ton crane and lowered onto machine moving skates at the building entrance. We then skated the machine in to the building using one of our 7...

Factory removal Midlands to Greater Manchester.

Hanlon and Wright have just completed the a factory removal from a manufacturing Company in the Midlands to Greater Manchester. The machinery mainly consisted of presses of which one weighed 50 ton and a 2nd one at 35 ton. Our engineers dis-connected the machinery, match marked...

Celebrating 50 years of machinery removals.

Hanlon and Wright are celebrating 50 years of machinery removals, installations together with complete factory relocation’s worldwide and specialised transport. We are still working for some very Notable Blue Chip Companies as well as small independent Companies whom we...

18.5 metre Grit Rake.

Hanlon and Wright recently reomoved this 18.5 metre grit rake from premises in Lancashire. Our engineers prepared the removal, then we lifted the rake out using a 100 ton crane, we loaded it onto one of our extendable low loader trailers. Once secure we then delivered the...

10 ton overhead crane removal.

After removing all the machine tools, benches, racking, etc,of this engineering works in Trafford Park, Manchester, which we transported and installed in new premises on the other side of Lancashire, including lining, levelling and fastening down. We then took down the overhead...

Removal and re-installation of jacket on Banbury D9 Mixer.

Here we have Hanlon and Wright engineers carrying out the removal of Banbury jacket on a D9 Mixer. Our engineers rigged up a gantry on the floor above the Mixer, we then un-bolted the jacket and lifted it clear of the mixer body using chain blocks, pull lifts and slings. The...

Re-location of 9.5 ton Grinder.

 Our engineers recently uplifted and re-sitted this 9.5 ton grinder. Once our electricians had dis-connected the electrics our engineers jacked up the grinder and skated the machine through the building to the loading bay area, the machine was then loaded onto one of our...

Installation of Cremator and Abatement plant in North Wales.

Here we have Hanlon and Wright's enginners carrying out the installation of Cremator and Abatment plant at a Crematorium in North Wales. Using an 80 ton crane the Cremator was off loaded from incoming transport and lowered onto a prepared platform at the building entrance,...

Installation of 10 ton Press brake.

Hanlon and Wright recently collected this 10 ton Press brake from an engineering company in the Midlands. We then delivered it to a company in the North West, the machine was off loaded using one of our rear mounted hiab type cranes, skated into position, where our engineers then...

Delivery and installation of 2 off 4000 kg hydraulic vehicle ramps.

Hanlon and Wright uplifted, loaded, delivered and installed 2 off 4000 kg hydraulic vehicle ramps at premises in Lancashire, including the fastening down, levelling and testing.