IMG_1193IMG_1198IMG_1205IMG_1207IMG_1200Here we have one of our low loader trailers with a 22 ton Cremaror that we collected from premises in mid France.

The equipment was delivered to a Crematorium in Norfolk, Off loaded by a 200 ton crane and landed onto a tempory platform at the building entrance.

The Cremator was then winched into position using machine moving skates.

The chimney sections we're then craned into position and connected to the Cremator inside the building.

The aero cooler was positioned using a 7 ton fork lift truck along with the filter section.

When everything was in position we connected all the services, lined, levelled and secured where necessary.