Tel:0161 330 7631 Email: enquiries@hanlonandwright.co.uk

Hanlon and Wright carried out at a major store in Newcastle upon Tyne,

The 750kg compressor was taken to the roof area using the goods lift, Hanlon and Wright then set up a 2t gantry, clamps, c/blocks on the floor to where the plant room is situated, the compressor was lifted up and positioned within the chiller unit, once the old compressor had been removed and loaded to transport.

26.06.12