Tel:0161 330 7631 Email: enquiries@hanlonandwright.co.uk

Hanlon and Wright install Cremator and Abatement plant in Suffolk,

This included delivery of 2 x 20 ton cremators and the abatement plant, off loading using a 120 ton crane and skating into position within the crematorium, we then built up the Abatement plant around the cremators, welding the steam pipework and connecting the electrics, air etc, line, level and fasten down.

20.07.12