The cremator was off loaded using a 120 ton crane and lowered onto machine moving skates within the entrance to the crematorium, then winched into position, the chimney flue was craned into position using the same 120 ton crane and a 60 ton crane fitted with a man basket so our engineers could lower the chimney into position, the remaining equipment was installed internally using one of our rough terrain fork truck outside and one of our 6 ton fork trucks within the crematorium, when in position the equipment was bolted down, lined and leveled.

22.11.13