Once we had disconnected, unbolted, the units were jacked of their anti vibration mounts then lifted out of position using 2 x SL10 genie lifts, traversed to the edge of the loading bay on machine moving skates then lifted down to ground level using one our 12000lb fork lift trucks, and loaded onto waiting transport. The new units were then lifted upto the plant room, again using the 12000lb fork lift truck, then once the units were traversed into position they were uplifted with the 2 x genie lifts into position, reconnected, secured, lined and levelled.

07.06.13