Once Hanlon and Wright had disconnected the services and removed duct work connected to the 2 x chiller units, we craned the old units down, new steel bases were craned up then bolted together by our engineers, we then craned the 2 x new chiller units up into position and secured, lined, levelled, and reconnected the services and duct work.