Fabrication and installation of pipe bridge

129
 
Once completed we delivered the pipe bridge to a Chemical manufacturing plant in Derbyshire, it was erected using one of our rear mounted hiab type cranes, then bolted together,A lined, levelled and secured.
15.04.14