Installation of 2 x Cremators and associated equipment.

Hanlon and Wright have just completed the installation of these two Cremators in Glsagow.

Our engineers off loaded the cremators form incoming transport using a 200 ton crane, we then winched the units into their final position, lined and levelled.

We then positioned and bolted together the 1 ton chimney sections on top of the cremators, joined all the pipework to the filter, boiler and aero cooler, lined levelled and secured where necessary.