Hanlon and Wright were required to remove the old chimney and then install a new chimney stack, Using an 80 ton crane and a 35 ton crane with a man basket attached, we removed the top layer of bricks from around the stack, unbolted the chimney at the top and bottom, attached slings the the chimney and lifted out, we thenrepeated the operation in reverse to install the new chimney, securing the chimney at the base and at the top, also cementing the bricks back into place.

24.11.12