Installation of Cremator and Abatement plant in North Wales.

FullSizeRender (11)FullSizeRender (012)FullSizeRender (014)FullSizeRender (016)

Here we have Hanlon and Wright's enginners carrying out the installation of Cremator and Abatment plant at a Crematorium in North Wales.

Using an 80 ton crane the Cremator was off loaded from incoming transport and lowered onto a prepared platform at the building entrance, from there we skated the cremator into position, lined, levelled and secured.

We then installed the sections of chimney flue's, once in position our engineers bolted the sections together.

Inside the crematorium we installed the filter and internal chimney flue's using one of our 5 ton fork lift trucks.

Wwe then connected all the pipework together, lined, levelled and secured the remaining plant.