Tel:0161 330 7631 Email: enquiries@hanlonandwright.co.uk

28  

The installation of medical equipment at a major hospital on the south coast, the units were off loaded by fork lift truck, traversed through the hospital to the basement plantroom, when in position the units were stood up right and lifted onto prepared steelwork using an adjustable gantry and chain blocks.

15.03.12