Tel:0161 330 7631 Email: enquiries@hanlonandwright.co.uk

Factory removal Midlands to Greater Manchester.

Hanlon and Wright have just completed the a...

Celebrating 50 years of machinery removals.

Hanlon and Wright are celebrating 50 years of...

18.5 metre Grit Rake.

Hanlon and Wright recently reomoved this 18.5...

10 ton overhead crane removal.

After removing all the machine tools,...

Removal and re-installation of jacket on Banbury D9 Mixer.

Here we have Hanlon and Wright engineers...

Re-location of 9.5 ton Grinder.

 Our engineers recently uplifted and...

Installation of 10 ton Press brake.

Hanlon and Wright recently collected this 10...

Delivery and installation of 2 off 4000 kg hydraulic vehicle ramps.

Hanlon and Wright uplifted, loaded, delivered...

Exchanging of 10 ton chiller unit in Manchester City Centre.

In the early hours of a Sunday / Monday...

Relocation of a machine shop from Lancashire to Cheshire.

Here we have our engineers carrying out the...

Factory removal from Liege, Belgium to Greater Manchester.

Here we have Hanlon and Wright carrying out a...

Relocation of a model steam engine manufacturer in mid Wales.

Hanlon and Wright recently carried out the...

Installation of two Grinding Machines.

Hanlon and Wright recently carried out the...

Removal and delivery of 18 ton roller.

Recently Hanlon and Wright uplifted and...

Delivery and installation of sand silo.

Here we have one of Hanlon and Wright's...

Relocation of 18 ton press brake

Here we have Hanlon and Wright's...

Installation of 2 x Cremators and associated equipment.

Hanlon and Wright have just completed the...

Delivery and installation of chiller unit.

Here we have one of Hanlon and Wright's...

Relocation of Printing lines.

Hanlon and Wright have just completed the...

Re-location of 35′ shower block.

Hanlon and Wright recently re-located this...

Installation of 12 ton chiller units.

Here we have 3 off our vehicles leaving our...

Installation of Abatement plant.

In the first picture we have one of our front...

Donation Of dugouts to local sports team.

Hanlon and Wright recently purchased these...

Installation of filling line

Here we have Hanlon and Wright Engineers off...

Here we have one of Hanlon and Wrights front...

Removal of filling line from Northern Spain.

Here we have Hanlon and Wright engineers...

Delivery and installation of 9 ton unit at premises in Scotland.

Here we have one of our front mounted Hiab...

Installation of Cooling Towers and Chiller units.

Here we have one of Hanlon and...

Removal and installation of Hoppers.

Hanlon and Wright have just carried out...

Office move

Hanlon and Wright have just completed the...

Installation of Textile cutting machine.

Hanlon and Wright have just completed the...

Installation of air conditioning units in the centre of Manchester.

Hanlon and Wright recently carried out the...

Installation of abatement plant

Hanlon and Wright recently completed the...

Collection, delivery and installation of 2 off 9 ton Boilers.

Using 2 of our rigid vehicles fitted with...

Installation of gear box.

Here we have a vehicle fitted with a crane...

Removal and relocation of grinding machines.

Hanlon and Wright recently uplifted these 2 x...

Off loading of 17 ton CNC machine and re-siting of various machine tools.

Hanlon and wright have just completed The off...

Off loading and storage of 2 x 13 ton chiller units

Here we have the 1st chiller unit being off...

Removal of Compactor.

Hanlon and Wright recently removed this...

Relocation of machine parts.

Here we have one of our 7 ton fork lift...

Installation of 22 ton Cremator and associated equipment.

Hanlon and Wright transport collected this 22...

Collection and off loading of pontoon.

Here we have one of our front mounted hi-ab...

Chiller unit dismantle and re-build on site.

Here we have a 12 ton chiller unit being off...

Installation of bag making line.

Hanlon and Wright recently caaried out...

Factory relocation of UPVC building manufacturing Company.

Hanlon and Wright have just completed the...

Hanlon and Wright transport in the Manchester Parade.

Here we have one of our Tractor units and low...

Chiller unit installation

Here we have Hanlon and Wright engineers...

Installation of Cremator and Abatement Plant

Hanlon and Wright have just completed the...

Removal of moulding machinery.

Hanlon and Wright have recently removed...

Installation of 7 ton air handling unit.

We recently carried out the installation of...

Exchanging of chiller units

  Once Hanlon and Wright had...

Installation of textile machinery

  The looms were off loaded from...

Removal of stainless steel vessels

  Using one of our extendable...

Fabrication and installation of pipe bridge

  Once completed we delivered the pipe...

Delivery and installation of 18 ton roller

  We then delivered to a Company in...

Removal of filtration unit

  Hanlon and Wright removed all the...

12 ton CNC grinder installation

  Hanlon and Wright off loaded...

Relocation of window manufacturing machinery

  We disconnected the electrics, jacked...

9 ton machine

  Using one of our rear mounted hiab...

Installation of 6 ton chiller units

  At a major NHS Hospital in the North...

34 ton Reactor

  Onto one of our low loader trailers at...

Installation of textile machinery

  The machines were off-loaded from...

Removal of chimney stack

  From a company in Cheshire, using a...

Ice skating rink in Belgium

  A unit from the Ice skating rink in...

Machine tools Barcelona to Lancashire

  Hanlon and Wright then transported...

Abnormal load

  We loaded 2 x high sections of steel...

Removal of CNC machine

  Hanlon and Wright, disconnected the...

Re-location of Hip Simulator

  Hanlon and Wright prepared this Hip...

Installation of 18 ton vessel

  We delivered the vessel, which we then...

Charity work

  Sheffield Eagles’ and Papua New...

Crematorium installation at Cleveland

  The cremator was off loaded using a...

Wide load Kent to Lancashire

  Being loaded onto one our extendable...

Installation of Robotic machinery in Lithuania

    Once off loaded from H & W...

Removal of printing machinery for Africa

  We recently dismantled printing...

Cremator installation

  Here is the 20 ton cremator being...

Low Loader

  Which required the use of one of...

Removal of various sized cables drums

  We uplifted and relocated over 100...

Local charity work

  One of our articulated vehicles with a...

Removal of medical equipment

  The 2 x vehicles are parked up...

Removal and re-installtion of Pan wash

  We then loaded to H & W transport,...

Shut down work at a Petroleum plant

  whom we have worked for in excess of...

Installation of new plant

  Hanlon and Wright carried out the...

Exchanging of 3 x 10 ton units

  Hanlon and Wright carried out the...

Ex changing of air conditioning units

  Once we had disconnected, unbolted,...

Wide load

  Hanlon and Wright removed the ladders,...

Felt line installation in India.

  We have unloaded the machinery from...

Loading up of equipment

  Being loaded onto our low loader plant...

Loading units for delivery to Germany

  Once loaded the units were delivered...

Felt line installation in India

The crew left Manchester for India on friday,...

Industry day

  Using, gantry, chain block, lifting...

Removal of a 5 ton compressor

Using 2 x 5 ton adjustable gantries along...

Removal and re-installation of 1 x column.

  Prior to lifting the old column out,...

Hanlon and Wright aid underprivileged childred in Papua New Guinea

SPORTS GEAR GIFT HEADS ACROSS THE WORLD RUGBY...

Removal of 7 1/2 ton Rubber Granulater

  Of a 7 1/2 ton Rubber Ganulater from a...

Installation of chiller unit

Hanlon and Wright carried out the...

Loading of Generator for delivery to Saint Etienne, France

8 tonne generator, In the picture we have our...

Removal of 5 tonne compressor

  From within the premises of A...

Final containers are loaded for India

Hanlon and Wright have loaded the final...

Hanlon and Wright help young people prepare for working life.

  Hanlon and Wright have been awarded...

Installation of manufacturing line

Hanlon and Wright have just completed the...

Christmas shutdowns

Hanlon and have Wright have just completed...

Installation of 20 ton Cremator and Abatement Plant in Berkshire

  At a Crematorium in Berkshire. The 20...

Installation of Chimney stack

  Hanlon and Wright were required to...

Installation of packaging line

  At a manufacturing company in...

Hanlon & Wright aid underprivileged children in Kenya

  We are delighted to say we have been...

Removal of plant room equipment

  From a manufacturing Company in...

Internal movement of Mixing machines

  Once we had disconnected all of the...

Dismantling of manufacturing line for shipment to India

Today we have started the dismantling of a...

Removal of 12 ton vessel and installation of new

  The vessel was lowered to the ground...

Installation of mixing machines

  The machines were off loaded using one...

2nd cremator and abatement plant installation

  This installation was at a crematorium...

Installation of 4 x 600kg boilers

  These we're uplifted to the 2nd...

Removal of Printing machinery

  Loading printing machinery at a...

Hanlon and Wright supports Kits2Kids charity

  Load of sports kits for...

Hanlon and Wright supports Kits2Kids charity

  Who recently called into our depot in...

Removal of 3 storey platform and walkway.

  From a Company in Lancashire, which...

Installation of 10 ton Engraving machine

  At a company in north Manchester, we...

Vehicles being loaded ready for Lithuania

  Prior to leaving for Lithuania, where...

Off loading of 11 ton chiller units

Hanlon and Wright recently took delivery of 5...

Dismantle and removal of Accumulator

Hanlon and Wright have just completed the...

Cremator and Abatement plant installation

Hanlon and Wright install Cremator and...

Re-location of complete engineering workshop

Hanlon and Wright recently completed the,...

Installation of medical equipment

  With Filter dryer, 2 x receivers and...

Compressor change over

Hanlon and Wright carried out at a major...

Hanlon and Wright supports Kits2Kids charity

  Who recently called into our depot in...

Emergency chiller unit to France

  Along with all the pipe work, fittings...
12