Tel:0161 330 7631 Email: enquiries@hanlonandwright.co.uk

56  

The vessel was lowered to the ground using 2 x 10 tonne chain blocks, we then skated the vessel to the doorway, it was then lifted using an 80 ton crane, loaded to H & W low loader, re-located on site and off loaded using the Hi-ab type crane. A new 12 ton vessel was off loaded from transport using the 80 ton crane, skated into position then uplifted using the 2 x 10 ton chain blocks, once in position we positioned steelwork around the vessel and bolted into position.

29.09.12