From within the premises of A University in Yorkshire, the unit was removed from it's position using 2 x 5 tonne gantries along with chain blocks and girder clamps, lowered to ground level and secured to a special pallet, traversed through the plantroom, when at the loading bay it was loaded onto waiting vehicle and loaded using one of our hi-ab type cranes and returned to our depot, for onward transit to the manufacturer in France, once overhauled the Compressor returned approx one week later, we collected the Compressor from France, delivered back to site and positioned using the same equipment that was used on the removal, once in position the Compressor was lined, levelled and secured.

23.01.13