Tel:0161 330 7631 Email: enquiries@hanlonandwright.co.uk

39  

Delivered to a chemical manufacturing company in Cheshire, there we off loaded the vessel with the hi-ab, attached 2 x 5 ton chain blocks and lifted up through 2 floors and lowered into position onto a prepared plinth and fastened down.

24.05.12